Office of Facilities

Coastal Engineering Facility

Description:

UNCW plans to construct a new single story conventional framed building with brick masonry cladding in accordance with UNCW Architectural standards.  The building will provide approximately 16,000 square feet of space to be utilized as teaching laboratories, associated instructional space, and offices for the new Coastal Engineering program.

UNCW Project Manager:

David Holsinger, PE

FacilitiesACS@uncw.edu

Designer: SGA NarmourWright
Current Status: Advertisement for Prequalification for Prime Contractor
Estimated Completion Date: Fall 2021
Project Schedule:

Prequalification Packages will be received until 2:00 pm on July 02, 2020 by David Holsinger at 5150 Lionfish Drive, Wilmington, NC 28403-5910 for the construction of the Coastal Engineering Building. Packages will be reviewed by the UNCW CEB prequalification committee and notifications to be made July 23, 2020.

Prequalification forms for this project can be obtained below.

Forms may also be obtained from the Designer: SGA | Narmour Wright Design, 1815 S. Tryon St. Ste. A, Charlotte, NC 28203, c/o Mark Sealy, AIA, msealy@sganwdesign.com , 704.332.5668 ext 2016

Prequalification Form:

State of North Carolina Prequalification Form for Prime Contractor (PDF)

NC Prequalification Policy: State of North Carolina Prequalification Policy (PDF)
HUB Opportunities: FacilitiesACS@uncw.edu