Disability Resource Center

Construction Notice

Alderman Hall (East Entry) Sidewalk Repair - Uneven surfaces will be repaired near large pine tree. (Work to be in progress until January 1, 2017)

Wagoner Drive Crosswalk (near Kenan Auditorium) Sidewalk Repair - Ramp flare will be re-worked to delete sharp drop off. (Work to be in progress until January 1, 2017)

Warwick Center (East Entry Plaza) Sidewalk Repair - Multiple concrete panels will be replaced due to uneven surfaces. (Work to be in progress until January 1, 2017)

Psychopharmacological Lab (East and South of Buiding) Sidewalk Repair - Uneven surfaces will be repaired. (Work to be in progress until January 1, 2017)

Schwartz Hall HVAC Unit - A project is in progress at Schwartz Hall to replace the roof top HVAC units.  This will impact exterior walks on Thursday December 15, 2016.  Cranes and large semi-trucks will be in the vicinity of the south parking lot of Schwartz Hall as well as the side of the building facing Walton Drive.  The sidewalk along Walton will be blocked throughout the day on the 15th. (Work to be in progress until January 1, 2017) 

Hamilton Drive (Old Soccer Field) Driveway Construction - A project is in progress along Hamilton Drive at the old soccer field entrance to build a driveway entry for emergency vehicles.  The entire sidewalk is blocked on the east side of Hamilton for approximately 40 yards.  Please use the west sidewalk along Hamilton through this area. (Work to be in progress until January 1, 2017)

Be alert in construction zones. Look out for hazards and remember the site will change daily.

For questions regarding access around construction sites or for additional information please contact:

  • Business Affairs 910-962-3067
  • Campus Police 910-962-2222
  • Disability Resource Center 910-962-7555